国产成人无码专区,国产精品亚洲产品一区二区三区,色综合天天综合婷婷伊人,久久久不卡国产精品一区二区

歡迎來(lái)到,深圳市芬德電子科技有限公司官網(wǎng)!

finder功率繼電器

聯(lián)系電話(huà):0755-84552800

手機(jī)號(hào)碼:189-2606-1910

News
熱門(mén)搜索: Motor automation equipment、 Enclosure、 Product 40 series55 series、 38 series、 Series 80...

News

Shenzhen Fende Electronic Technology Co., Ltd

Address: d1001, Vanke building, No. 7188, Longxiang Avenue, Longgang District, Shenzhen

Tel: 0755-84552800/01/02/03
Fax: 0755-0755-28891512

Email:sales@ff-energy.com

Industry trends

Wiring method of finder power relay

文章出處:芬德電子科技 / 作者:芬德電子科技 / 發(fā)表時(shí)間:2022-05-24

1. Connect correctly according to the external wiring diagram, and pay special attention to that the voltage and current connected to this device must be phase A and phase C, and the same polarity terminal connected to the current transformer is correct.


2. Turn on the power, and the "power" indicator light is on. When the toggle switch is placed in the "test" position, the finder power relay and the unloading "out of limit" indicator light will be on, and an alarm signal will be output. After a few seconds of delay, the "action" indicator light will be on, but the reverse power and unloading output finder power relay will not act, indicating that the internal logic function of the device is normal. The delay time is the reverse power and unloading delay time respectively, and its value can be adjusted by the "reverse power delay time" adjusting potentiometer (lower left) and the "unloading delay time" adjusting potentiometer (lower right), and clockwise is the increasing direction. Then turn the toggle switch to the "run" position.

Note: the time interval of the second test should be greater than 30 seconds. Otherwise, the "delay time" of the second test will be shorter.


3. When the units operate in parallel, the voltage remains rated so that a unit can reverse its power. When a certain value is reached, the reverse power "over limit" indicator light is on. After the delay, the "action" indicator lights up, and the finder power relay will trip the main switch. The reverse power unit is listed. The action power can be adjusted through the "action power adjustment potentiometer" (located at the upper left), which is the increasing direction clockwise. If the finder power relay acts when a single machine is running at positive power, the wiring of terminals 1 and 2 should be replaced.

78.jpg

4. Setting of unloading action value and delay time:

Turn the "action current" clockwise to adjust the potentiometer (upper right) to the maximum value. Increase the load current of the generator to the value that needs to be unloaded, and then slowly adjust the potentiometer counterclockwise until the "out of limit" indicator light is on, and then start timing until the "action" indicator light is on, and the secondary load is unloaded, which is the delay time of the action of the unloading device.

Users can request the setting value when ordering and set it when leaving the factory.

Overall dimension: width × high × Thickness =150 × one hundred and five × 68; Installation size: 140 × 954- Φ five

Wiring method of power direction relay

Connection method between relay and current transformer and voltage transformer.

The following requirements shall be met:

(1) It is necessary to ensure that the power direction relay has good directivity. That is, any type of fault in the forward direction can act, but the reverse fault will not act.

(2) Try to make the power direction relay more sensitive in case of forward fault, φ K approach φ sen。

辽中县| 吴旗县| 满城县| 沅陵县| 夏邑县| 四平市| 德昌县| 托克逊县| 藁城市| 宾阳县| 郁南县| 芜湖市| 赤峰市| 定陶县| 十堰市| 云和县| 河北区| 屏南县| 泰州市| 镇安县| 阿拉善左旗| 华池县| 张家口市| 静海县| 怀远县| 宁德市| 长武县| 平塘县| 浠水县| 花莲市| 宁夏| 西平县| 大埔区| 天津市| 信宜市| 怀仁县| 微山县| 日喀则市| 金溪县| 略阳县| 江阴市|